The Excavation Diary

The excavation diaries are a daily log kept by the excavators on site during each season. They record the day to day activity of the team and their observations on their work.
 
Displaying Diary Entries for Space: 297

Page 1 of 1 (Total Records: 3)
Name: Roddy Regan 
Team: Çatal 
Date: 22/07/2006 
Entry: At last our building changes shape, although it pretty much occupies the same space apart from an extra platform in the south west. The structure looks pretty good in that like building 56, building 65 appears pristine with sharp edges to the features an... click here for more... 
 
Name: Eleri Cousins 
Team: Stanford 
Date: 14/07/2007 
Entry: Today was my first day back on site after a week in the labs. Kristen and I spent the day planning and removing various layers from the floor of building 65 (the whole building is started to be taken down now). Everything was really fragmentary and hard... click here for more... 
 
Name: Charlie Newman 
Team: Çatal 
Date: 16/07/2007 
Entry: This last week has been very productive, namely concerning the construction phases of buildings. At the end of last year Matt and I found a large phytolith deposit within space 118 building 68. As Matt would say, muchos grandos phytolithos. I refer to ... click here for more... 
 

Page: [1 ]

 
<< BackDownload these Entries