Sample List

When a Unit is excavated a set of samples are taken from it, this means that parts of the unit are placed in special containers and labelled. These samples are saved for analytical purposes and are used by the Specialists on the site to discover more about the activity and the environment surrounding the Unit when it was exposed.
 
Displaying Sample Numbers in the Unit: 17390

Page 1 of 1 (Total Records: 4)
Sample No.TypeAmountComment
Unit: 17390 
Archive 0.5 Routine 
Flotation-routine 21 Routine. Original entry of 30 replaced by volume for sample from Flot Log 19/08/09. Flot Log Vol: 21 
Plasters-painted wall 0.01 Sample amount originally entered as 10g translated to 0.01 litres 26/08/09 
Plasters-feature plaster 0.005 Painted plaster post on wall. Sample amount originally entered as 5g translated to 0.005 litres 26/08/09 

Page: [1 ]

 
<< BackDownload these Samples